We look forward to hearing from you!

© 2020 Copyright Permit Sets by DOSDG.com

ASTTBC

Check out our reviews!

 

Feasibility Reports

Feasibility Reports and Property Zoning Summaries

A Property Zoning Summary from PermitSets tells you what a specific British Columbia lot allows you to build. It sets out the zone and governing bylaw section, how many dwelling units are permitted, maximum site coverage, maximum building height, minimum setbacks, spacing between buildings, and carriage house and secondary suite limits. It costs $299 and is emailed within 24 hours of payment. A free address lookup returns basic parcel facts instantly, before you order anything.

[Order a Property Zoning Summary, $299]https://tools.permitsets.com/lot-zoning-summary

[See a sample report, PDF]https://tools.permitsets.com/sample-zoning-summary.pdf

[Request a custom Consultation]https://permitsets.com/request-quote/

What is a Property Zoning Summary?

A Property Zoning Summary is a written report on one BC lot that states what the current zoning bylaw permits on that specific parcel. It is prepared by PermitSets, cites the bylaw and section each figure comes from, and reports every dimension in metric with imperial in brackets.

It is used before design begins, so that the site plan, the budget and the client’s expectations are all built from the same set of facts rather than from an assumption about what the neighbour was allowed to do.

What does the $299 report include?

The published sample report is three pages and covers nine sections:

  1. Property identification. Civic address, legal description (PID, lot, plan), jurisdiction, roll number.
  2. Lot data. Lot area in metric and imperial, frontage, depth, and how those compare to the zone’s subdivision minimums.
  3. Zoning designation. Zone name and category, bylaw number and section, OCP future land use, and ALR status.
  4. Site coverage and density. Maximum building coverage, maximum all-impervious coverage, maximum dwelling units, minimum lot area for subdivision, and how those thresholds change at higher unit counts.
  5. Building height. Maximum principal height in metres and storeys, walkout basement allowances, upper storey floor area limits.
  6. Minimum distance between buildings. Spacing between principal buildings and to accessory structures, and what that spacing means under BC Building Code limiting distance rules (Subsections 9.10.14 and 9.10.15) for permitted window area, wall fire ratings and cladding.
  7. Accessory buildings and secondary dwellings. Permitted principal and secondary forms, carriage house and secondary suite maximum floor areas, accessory building footprint limits.
  8. Minimum setbacks. Front, flanking, side and rear, including reductions and exceptions for lanes, corner lots and lots with three or more units.
  9. Notes and additional conditions. Riparian and watercourse triggers, water provider, land use contract status, energy code notes, and any other site specific condition that changes what is buildable.

How do I order one?

  1. Enter the address at tools.permitsets.com/lot-zoning-summary. Free parcel facts return immediately and can be emailed to you.
  2. Submit the order form. Name, email, optional phone, and any specific notes, questions or considerations you want the report to address.
  3. Pay. PermitSets emails payment details after the form is submitted.
  4. Receive the report within 24 hours of payment.

[Order now, $299 →] https://tools.permitsets.com/lot-zoning-summary

Why does zoning research pay for itself?

Because the cheapest change is the one made before design starts.

The Construction Industry Institute studied front end planning across 17 case studies from projects worth over $1.5 billion, analyzing project data in excess of $35 billion. It found that effective front end planning improves capital costs by about 10 percent, reduces schedule by about 7 percent, and reduces change orders by about 5 percent. (Construction Industry Institute, Front End Planning: Break the Rules, Pay the Price, RS213-1)

In a related CII summary, owners reported that projects intensely implementing front end planning realized an average cost advantage of 8.6 percent over projects that implemented it less intensely. (Construction Industry Institute, Front End Planning: Your Key to a Successful Project)

CII defines front end planning as the project phase covering feasibility, concept and detailed scope definition, and identifies it as the single biggest factor in controlling cost and schedule on capital projects.

A residential lot is a smaller version of the same problem. Finding the rear setback, the coverage cap or the riparian trigger after the drawings are finished means redrawing, re-costing, and sometimes reapplying. Finding it first means the design starts inside the envelope.

When do you need a full feasibility report instead?

The $299 Property Zoning Summary answers what the bylaw permits on a lot. A custom feasibility report is the better fit when the property has:

  • A stop work order or an existing work-without-permit issue to resolve
  • Multiple massing or subdivision options that need to be compared against each other
  • Heritage designation, covenants, easements, rights of way or a land use contract
  • Steep slope, watercourse, riparian or environmental development permit area constraints
  • A change of use, or a commercial or mixed use component
  • A rezoning or variance path rather than a straight permit path

Zoning terms, defined

These definitions describe how the terms are generally used in BC zoning bylaws. The governing definition is always the one in the municipality’s own bylaw, and each report cites it.

Setback. The minimum required horizontal distance between a building and a lot line. Bylaws set separate front, flanking, side and rear setbacks, and often reduce the rear setback where the lot abuts a lane or contains more dwelling units.

Site coverage. The share of the lot area that may be covered by buildings, expressed as a percentage. Many BC bylaws set a separate, higher limit for total impervious coverage, which counts driveways and patios as well as buildings.

Density. The maximum number of dwelling units permitted on a lot, and in some zones a floor area ratio limiting total floor area relative to lot area.

Carriage house. A detached secondary dwelling on the same lot as a principal dwelling, typically capped by a maximum net floor area and its own setback rules.

Secondary suite. A self-contained dwelling unit inside a principal dwelling, typically capped by a maximum net floor area.

Limiting distance. The distance from a building’s exposing face to a lot line or to another building, used under BC Building Code Subsections 9.10.14 and 9.10.15 to determine how much unprotected window area is allowed and what fire resistance rating and cladding the wall needs. A greater separation permits more glazing and less fire protection.

ALR. The Agricultural Land Reserve. Land inside it is subject to Agricultural Land Commission regulation on top of municipal zoning.

OCP. Official Community Plan. It sets the future land use designation for a property, which matters for rezoning prospects even though current zoning governs what can be built today.


Project considerations

Decisions about construction method and design solution set the direction of a project, and changing direction later costs time and money.

Keep the design variables triangle in mind: cost, quality and time. It is easy to focus on one corner and give up the other two. High quality at low cost always takes longer, and time is a cost of its own.

The PermitSets design library focuses on wall assemblies and construction details that are updated as the BC Building Code develops and new materials reach the market. Clients are welcome to select their own construction methods and materials and do that research themselves. On full service proposals, that research is part of what PermitSets has been hired to do.

Why R-value is worth a second look. Most projects build to the minimum, either to keep material costs down or because newer assemblies are unfamiliar. Newer techniques can cost more in materials while saving on labour, operating costs, or both. Exceeding the minimum insulation requirement is often offset by gained floor area and reduced heating and cooling costs. This matters more each year as BC municipalities add energy requirements and incentives.

FAQ

What is a Property Zoning Summary? A Property Zoning Summary from PermitSets is a written report on one BC lot covering the zone and bylaw reference, permitted dwelling forms and density, site coverage, building height, setbacks, spacing between buildings, accessory building and secondary suite limits, and site specific conditions such as ALR or riparian status. It costs $299.

How much does a zoning report cost in BC? A PermitSets Property Zoning Summary costs $299 for a single lot. A custom feasibility report is quoted per property.

How long does it take? The report is emailed within 24 hours of payment. Free parcel facts from the address lookup return instantly.

How do I pay? Submit the order form with your name and email. PermitSets emails payment details, and the report follows within 24 hours of payment.

Can I see an example before ordering? Yes. A full sample report is published at https://tools.permitsets.com/sample-zoning-summary.pdf.

Is the report a survey? No. Lot dimensions in the free lookup are approximate and derived from ParcelMap BC, and should be confirmed against a survey. The report cites the bylaw provisions that apply, and all data should be verified against the current consolidated zoning bylaw before design.

Does the report guarantee approval? No. It states what the current bylaw permits so the design can start inside the envelope. Approval decisions rest with the municipality, and site specific reviews such as riparian assessment or development permit area review may still apply.

What is the difference between a Property Zoning Summary and a feasibility report? The Property Zoning Summary answers what the bylaw allows on a single lot. A custom feasibility report tests specific options, complications or permit pathways for a project, such as a work-without-permit resolution, a subdivision comparison, or a rezoning path.

Do I still need permit drawings? Yes. The summary informs design. When the project is ready to apply, PermitSets prepares the permit drawing package.